Sub-contracted to perform an operational condition assessment of the primary water system under the World Bank-funded project for restructuring water network in Maan Governorate. The assignment focused on establishing NRW baselines to quantify water losses across production and transmission facilities. The scope included comprehensive field data collection, site inspections, operational performance analysis, design reviews, and verification of bulk water measurements.
Advanced technologies, such as portable ultrasonic flowmeters and pressure loggers, were utilized to ensure accurate data acquisition and high-quality results. The outcome of the activity was a detailed NRW assessment report, accompanied by practical recommendations aimed at enhancing operational efficiency and strengthening NRW monitoring and management.



